    Does conduit need to go inside the transformer box?
    No. Conduit should be stopped just short of the box.
    How close to the pole do I bring my conduit to?
    The top of the elbow must be 6" from the pole..
    Is additional conduit required beyond what is installed in the ditch?
    If the service is being supplied from a utility pole, the member is required to supply 1-10 section of SCH 80 PVC and 2-10 sections of SCH 40 PVC to be left near the base of the pole for installation by the power company up the pole.
    Does someone need to inspect the ditch before covering the conduit?
    Yes, contact the power company and a representative will come and inspect the ditch and conduit. The representative will place a white sticker on the meter panel with a pass or fail notice.
    Is there a difference in meter bases?
    Yes, There are three types. Overhead only, Underground only, and Overhead/Underground combination bases. However, combination boxes are not recommended for Underground installations because of their limited wire space.
    Can septic lines be installed under power lines?
    Yes
    In the State of Maryland can permanent service be installed if the house has had a rough inspection?
    In the State of Maryland, before a utility company can energize (turn on permanent service to) a structure, there are legal inspection/certification requirements. Specifically:

    Under Maryland Public Safety Code § 12‑605, before a utility authorizes current to be turned on for a premises or structure, the utility must receive a “cut-in certificate” (electrical inspection certificate) from a qualified inspector or governmental unit. Source: Maryland Public Safety Code § 12-605

    A “rough-in inspection” itself is not the final inspection. For example, one local amendment states that a “service inspection” must be made after the metering equipment, grounding, main disconnect means & all associated service wiring are installed, prior to being energized by the utility company. Source: Approved – Chapter 64, Article 4 Electrical Code Amendments (City of Hagerstown)

    So the answer is: No, simply having a rough-in inspection passed does not automatically allow permanent service installation (energizing) in Maryland. The full service equipment must be installed and inspected and a cut-in (or service) certificate issued before the utility can legally connect power.
    What about outdoor lighting?
    We offer a variety of lighting products including decorative colonial, cobra head, directional floodlights, and security lights. We can customize plans to fit any lighting need.
    Send us your questions below
    Ask Your Question
    Are you stumped by a home wiring project or problem? Don't worry – we are here to help. There are a number of options available for you.

      All Electrical work must be done by a qualified licensed electrician.